Supplying Services |

Development Process |
1. Process design
__Plant Simnulation

2. Design of dedicated facility
__Robot Simulation

3. Private Production
__Universal Purchase

4. Installation
__Equipment Stabilization

5. Interlocking Trial Operation
__Quality Stabilization

6. Local Installation
__Education / Training

Develop Process |
1. Process design __Plant Simnulation | 2. Design of dedicated facility __Robot Simulation |
![]() | ![]() |
_ | _ |
3. Private Production __Universal Purchase | 4. Installation __Equipment Stabilization |
![]() | ![]() |
_ | _ |
5. Interlocking Trial Operation __Quality Stabilization | 6. Local Installation __Education / Training |
![]() | ![]() |
Application Example |
Major Customers |

SHINYOUNG
HMC / KMC (LF, AD, TM, HI, OS, etc.)

SMART
HMMA (ADa, LFa, TMa, YFa, etc.)

PHN
HONDA (2CT, 2WF, TVAA)

PETERFORM, COSMA
HMMR (GSr, HCr, FB, FB CROSS) / NISSAN (WAVE1,2)

ZYBODY
CHERY (T21, A16, S12), QOROS (CF16)


COSMA(FORMPOL), ALLGAIER
GM (22A), DAIMLER(BR247, X243)

PEMSA
NISSAN (LO2D, L21B, L32H, X11C, H60A)

METALSA, ALLGAIER
GM (GMT250), DAIMLER (V177,X247), AUDI (Q5)